Summary
A total of six mounds were selected for survey, two are located within the L&ID wind farms, created in 2007 adjacent to turbines LN02 and LN29 and named Mound A and Mound B respectively. The four other mounds, labelled Mound C to F are located within the Lincs wind farm at turbines LS61, LS62, LS43 and LS44 respectively and were created in duri...