Summary
EGS (International) Ltd was contracted to undertake a marine geophysical survey of six cables within the Lynn Offshore Wind Farm (OWF) which had not been buried to target depth during the original installation phase. The cables to be surveyed were between the following wind turbines; LN01 to LN06, LN06 to LN11, LN11 to LN16, LN16 to LN21, LN08 to L...