2009-2010, Brown and May Marine Ltd., Lynn and Inner Dowsing Offshore Wind Farms, Year 1 Post-Construction Potting Survey
Summary
These reports detail the findings of the post-construction potting surveys undertaken in the area relevant to the operational Lynn & Inner Dowsing offshore wind farms. The survey is the Year 1 post construction survey which spas across 2009 and 2010.
The survey methodology used is detailed in the “LID Offshore Wind Farm Post-construction Potting Survey, August 2009, Interim Report."
Data & downloads
Datasets
