Summary
EGS (International) Ltd was contracted to undertake the 2013 Post-Construction hydrographic and geophyscial survey (Multibeam and side scan sonar systems) of the Lynn and Inner Dowsing (L&ID) Wind Farms and export cable routes. Additionally, an environmental survey was required for the 54 No Cable Zones. With respect to the Scope of Work, the...