Summary
Emu Ltd conducted a series of hydrographic and geophysical monitoring surveys for Centrica Renewable Energy Limited at the Lynn and Inner Dowsing wind farm sites, primarily from 30 June to 26 July 2009, with additional ecological sampling in September 2009 and comparative surveys dating back to 2007. The purpose was to assess and map seabed habitat...

