
2006 - 2007, CMACS, Burbo Bank, Seabed Scour and Cable Monitoring
Summary
This report relates to seabed scour and cable burial monitoring that took place at the site of the Burbo Bank Offshore Wind Farm. Two relevant surveys have been undertaken: 1, a bathymetric survey by OSIRIS Projects Ltd to look at the success of rock dumping around turbine foundation bases; 2, a survey by CT Offshore to measure cable burial depth of all inter-array and export cables.
Data & downloads
Reports
