2007 - 2008, CMACS, Burbo Bank, Environmental Monitoring Survey

2007 - 2008, CMACS, Burbo Bank, Environmental Monitoring Survey

Summary

Centre for Marine and Coastal Studies Ltd (CMACS) was appointed by SeaScape Energy Ltd in April 2005 to develop and undertake pre and during construction environmental monitoring to meet the requirements of the Food and Environment Protection Act (FEPA) licence issued to the wind farm developer. The Environmental Monitoring Methods have been developed in consultation with statutory and non-statutory consultees. Monitoring is being undertaken through a series of discrete surveys covering various environmental and ecological components. The purpose of the report in this series is to bring together the various technical reports which present results of the different strands of the environmental monitoring. An overview of the results is provided in an Executive Summary (Section 3) and inter-related elements of the monitoring are considered in Section 4. Detailed information is provided in the technical reports within Appendix 3.
Categories
BirdsEpifauna and FishIntertidal EcologySedimentology
Development
Burbo Bank
Industry
Wind
Phase
Construction
Organisation
Centre for Marine and Coastal Studies Ltd
Available in this series
1 Report

Data & downloads

Reports