2019, Natural England and JNCC, Offshore Wind Leasing Round 4, Advice on key sensitivities of habitats and MPAs to offshore wind farm cabling
Summary
Data & downloads
Reports
Data Highlights
Related Pages
Series2019, RPS, Offshore Wind Leasing Round 4, Review of Cable Installation, Protection, Mitigation and Habitat Recoverability, Report on behalf of The Crown Estate
This project sought to provide a desk-based review of cable installation techniques and protection used for offshore wind and other cables related projects in order to better understand how seabed habitats are affected by such activity. The project collated and assessed information on cable installation techniques used in the UK, and considered the effectiveness of these installation methods and tools in different seabed types. The project also collated and assessed information on the impacts of cabling on seabed habitats and communities, and provided a series of recommendations for future consent applications and proposals for best working practices during and after cable installation.
Series2019-2020, The Crown Estate, Round 4 Habitats Regulations Assessment (HRA), Front Loading Projects
The Crown Estate commissioned a series of research projects aimed at decreasing uncertainties and thereby building the evidence base to support the delivery of the plan-level Habitats Regulations Assessment that will be required for Round 4 of Offshore Wind Leasing.
Series2019, Natural Resources Wales, Offshore Wind Leasing Round 4, Sensitivity of marine ecology receptors to cabling activities
This report has been produced by Natural Resources Wales (NRW) marine ecosystems and physical processes specialists to help inform potential siting of cabling infrastructure associated with offshore wind farm developments in Wales within Offshore Wind Leasing Round 4. The document contains a high-level overview of some of the key considerations needed for marine ecosystem receptors in Wales. For any associated information and/or data please visit http://lle.gov.wales
2019, The Crown Estate, Offshore Wind Leasing Round 4, Launch Documents
Final documents published at launch of Offshore Wind Leasing Round 4 in September 2019. Following over 18 months of engagement with the market and stakeholders, The Crown Estate has developed and refined its proposals for Leasing Round 4. The Crown Estate has published the detail of this work, as well the detailed data and analysis of constraints affecting the characterisation areas inside each of the Seabed Bidding Areas, to assist potential bidders in their preparations for Round 4.
2019, MacArthur Green, Offshore Wind Leasing Round 4, Review of ornithology constraints for Offshore Wind Leasing
This report reviews offshore ornithology environmental statements and associated planning papers, relevant scientific publications and reports, considers mapping of seabird densities, and lists identified key ornithological impacts that could constrain development in two characterisation areas; Area 3 (Yorkshire Coast) and Area 4 (The Wash). The report proposes recommendations that were considered in the refinement of regions that in turn formed the potential locations for new seabed rights for Round 4.
Series2018, The Crown Estate, Round 4, Initial Proposals and Interim Reports for Round 4
Initial proposals and interim reports for Offshore Wind Leasing Round 4 presented to statutory organisations and bodies, and the market, in July 2018. We continued to engage with statutory organisations and planning authorities to assess potential locations for new seabed rights off the coast of England, Wales and Northern Ireland. We also continued to build upon the evidence base to identify, characterise and refine the most favourable areas of the seabed. By refining the number of regions and sharing our detailed data and analysis of constraints affecting the characterisation areas inside each of these regions, we aim to support and inform the markets’ selection of sites, helping to reduce consenting risk, and ensure the most viable projects come forward. For the final version of these documents released at the launch of Offshore Wind Leasing Round 4, please refer to this series: 2019, The Crown Estate, Round 4 Launch Documents.
Series2018, National Grid, Offshore Wind Leasing Round 4, Offshore Wind Constraints Study
National Grid System Operator was commissioned by The Crown Estate (TCE) to undertake a desktop feasibility study assessing the possible impacts of connecting new offshore wind generation in various locations to the transmission system in England and Wales. The main output from this study is a series of maps illustrating the likely transmission system cost impacts of connecting different sized offshore wind projects over the timeframe 2025-2040 and under the scenarios considered.