Summary
Partrac Ltd were contracted to carry out a sediment monitoring survey on two occasions during the piling of the foundations at the Ormonde offshore wind farm. occurred during a neap tide (6th May 2010) and during a spring tide (1st June 2010). No trace of elevated total suspended solids were detected at the distance at which the surveys took place...