2010, RPS Energy, Ormonde, Marine Mammal Observer's and PAM Survey

2010, RPS Energy, Ormonde, Marine Mammal Observer's and PAM Survey

Summary

Between 30/04/2010 and 21/07/2010, the jack-up rig Buzzard carried out pile-driving at 30 generator sites and at one substation for the Ormonde Offshore Wind Farm in UKCS block 113/28 in the Irish Sea. The document in this series reports on the implementation of a plan to mitigate potential impacts of pile-driving noise on marine mammals arising from these operations.
Categories
Marine MammalsNoise
Development
Ormonde
Industry
Wind
Phase
Construction
Organisation
RPS Energy
Available in this series
1 Report

Data & downloads

Reports