
2009, Fugro Alluvial, Ormonde, Geotechnical Site Investigation
Summary
Fugro Alluvial Offshore Limited has performed a geotechnical investigation for Ormonde Energy Limited, to assist in the design of the foundations for wind turbines and associated seabed structures. The investigation comprised continuous deep push PCPTs to a target depth of 36 metres at 30 turbine locations and one substation location. Turbine locations CPT11, 21 and 29 were tested to a target depth of 45m or refusal at the client’s request.
Data & downloads
Datasets
