Summary
Monthly boat based bird surveys were undertaken at the Ormonde OWF. Surveys were conducted in May, July, August and October (September was proposed but the survey was delayed due to weather).
Monthly boat based bird surveys were undertaken at the Ormonde OWF. Surveys were conducted in May, July, August and October (September was proposed but the survey was delayed due to weather).
Explore the wealth of the data gathered in the 2012, CMACS, Ormonde, Boat-Based Ornithological Survey
A 2012 Bird Survey within Ormonde Offshore Wind Farm