Summary
Partrac Ltd were contracted to undertake a sediment monitoring survey at the Ormonde offshore wind farm (OWF). This occurred over a Spring tide (3rd to 5th July 2012). Three locations were surveyed: at the northern turbine in the array (OR-D8), around the southern turbine in the array (OR-A1), and a control station 2km from the OWF. A YSI 6600 mult...