
2013, RPS Energy, Ormonde, Annual Monitoring Report
Summary
Data & downloads
Reports
Related Pages
Series2014, RPS Energy, Ormonde, Commercial Fisheries Survey (Autumn)
In order to monitor the abundance and composition of fish and epibenthic species within the area, otter and beam trawl surveys were undertaken during Autumn 2014 in and adjacent to the Ormonde offshore wind farm. The results of the second year of post-construction surveys have been compared with those obtained in 2009, 2012 and 2013.
Series2014, WWT, Ormonde, Pink-footed Geese and Whooper Swans Survey
RPS contracted Wildfowl & Wetlands Trust (Consulting) Limited (WWT Consulting) to provide weekly counts of peak numbers of Pink-footed Geese (Anser brachyrhynchus) and Whooper Swans (Cygnus cygnus) on the WWT Martin Mere reserve in Lancashire. These data were collected to inform consent licensing requirements at the Ormonde offshore wind farm, with the objective of determining whether the patterns of arrival of migrating Pink-footed Geese and Whooper Swans are impacted by the location of the offshore wind farms in the East Irish Sea. Counts were to take place from the week commencing 7th September to the week commencing 21st December, 2014.
Series2014, CMACS, Ormonde, Boat-Based Ornithological Monitoring
As part of the environmental monitoring under the conditions of the Ormonde Offshore Wind Farm Marine License (L/2011/00201/10), Vessel based transect surveys of sea birds in and around Ormonde offshore wind farm were conducted in May, July, August and September. The series includes reports and data from the ornithological surveys.
Series2014, Brown and May Marine, Ormonde, Adult and Juvenile Fish and Epi-benthic Survey
The aim of the survey was to establish the abundance and composition of adult and juvenile fish and epi-benthic species within the area of the Ormonde offshore wind farm. A further aim was to define any notable changes in species composition with reference to the pre-construction surveys undertaken in 2009.
2014, Aarhus University, Ormonde, Ornithological Survey
Aerial bird survey conducted over the Ormonde wind farm and adjacent areas in order to fulfil conditions set out in the project Marine Licence (L/2011/00201/10). The survey work was scheduled to occur in December (2013) and January (2014). However, due to poor weather conditions, the survey was undertaken during January and February, 2014.
Series2013, Brown and May Marine, Ormonde, Adult and Juvenile Fish and Epi-benthic (Autumn)
In order to monitor the abundance and composition of fish and epi-benthic species within and adjacent to the Ormonde offshore wind farm, otter and beam trawl surveys were undertaken during autumn 2013. The results of the second year of post-construction surveys have been compared with those obtained prior to construction in April 2009 and October 2009, and post-construction in October 2012 and April 2013.
Series2013, WWT, Ormonde, Pink-footed Geese and Whooper Swans Survey
RPS contracted Wildfowl & Wetlands Trust (Consulting) Limited (WWT Consulting) to provide weekly counts of peak numbers of Pink-footed Geese Anser brachyrhynchus and Whooper Swans Cygnus cygnus on the WWT Martin Mere reserve in Lancashire. These data were to help inform consent licensing requirements at Walney, Ormonde and West of Duddon Sands offshore wind farms. Counts were to take place from the week commencing 1st September to the week commencing 22nd December 2013.
Series2013, EGS, Ormonde, Geophysical Survey
EGSi have been contracted to conduct a detailed bathymetric and geophysical survey of the Ormonde OWF and export cable route that can be compared with the data collected from previous surveys in order to meet the Marine Licence requirements. These require an assessment of the changes of both the bathymetry and the seabed morphology to be made at various time intervals across the site and along the cable route. Specific attention is to be paid to the differences in seabed depth and any identifiable areas of scour.
Series2013, CMACS, Ormonde, Year 1 Benthic Monitoring
Centre for Marine and Coastal Studies Ltd (CMACS) was appointed by RPS Energy on behalf of Vattenfall UK to undertake post-construction benthic environmental monitoring surveys for the Ormonde Offshore Wind Farm to meet requirements of the Marine Licence for the project.The overall aim of the survey was to acquire data on benthic fauna and seabed sediments using Day Grab and drop down camera to allow comparison with baseline data collected in 2009, before wind farm constructionSediment samples were acquired using a Day grab, and underwater digital images of the seabed were also collected.
Series2013, CMACS, Ormonde, Boat-based Ornithological Monitoring
As part of the environmental monitoring under the conditions of the Ormonde Offshore Wind Farm Marine License (L/2011/00201/10), Centre for Marine and Coastal Studies (CMACS) Ltd have been commissioned by RPS Group plc on behalf of Ormonde Energy Limited (OEL), a subsidiary of Vattenfall Wind Power Ltd, to carry out vessel based transect surveys of sea birds in and around Ormonde offshore wind farm. The series includes reports and data from the ornithological surveys conducted in May, July, August and September 2013.
2013, Brown and May Marine, Ormonde, Adult and Juvenile Fish and Epi-benthic Survey (Spring)
In order to monitor the abundance and composition of fish and epi-benthic species within the area, otter and beam trawl surveys were undertaken during spring 2013 in and adjacent to the Ormonde offshore wind farm. The results of the second year of post-construction surveys have been compared with those obtained prior to construction in April 2009 and October 2009, and post-construction in October 2012.
Series2012, Brown and May Marine, Ormonde, Adult and Juvenile Fish and Epibenthic Survey (Autumn)
In order to monitor the abundance and composition of fish and epibenthic species within the area, otter and beam trawl surveys were undertaken in and adjacent to the Ormonde offshore wind farm. The results of the October 2012 post-construction survey have been compared with those obtained prior to construction in April 2009 and October 2009.
