2013, CMACS, Ormonde, Year 1 Benthic Monitoring

2013, CMACS, Ormonde, Year 1 Benthic Monitoring

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

August 2022

Collection date:

May 2013 - May 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

August 2022

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Centre for Marine and Coastal Studies Ltd (CMACS) was appointed by RPS Energy on behalf of Vattenfall UK to undertake post-construction benthic environmental monitoring surveys for the Ormonde Offshore Wind Farm to meet requirements of the Marine Licence for the project.The overall aim of the survey was to acquire data on benthic fauna and seabed s...

Categories:
Benthic Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1