2006, Centrica and AMEC and RES, Race Bank - Docking Shoal - Lincs, A Review of Export Cable Installation Methodology Techniques and Tools

2006, Centrica and AMEC and RES, Race Bank - Docking Shoal - Lincs, A Review of Export Cable Installation Methodology Techniques and Tools

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2023

Collection date:

August 2006 - August 2006

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2023

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The connection of the Centrica Round 2 Offshore Wind Farms to the proposed
substation at Walpole St. Peter presents a number of challenges that require a
specialised and unique approach.
Due to the protected status of the environment in the Wash and its sensitivity to
disturbance, it is critical that the engineering methods proposed for installing ...

Categories:
Benthic Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Data Highlights


Explore the wealth of the data gathered in the 2006, Centrica and AMEC and RES, Race Bank - Docking Shoal - Lincs, A Review of Export Cable Installation Methodology Techniques and Tools


6

A review of export cable installation methodology, techniques, and tools (Lincs, Docking Shoal, Race Bank)