2016, Bibby HydroMap, Burbo Bank, Asset Integrity Management  Survey

2016, Bibby HydroMap, Burbo Bank, Asset Integrity Management Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

January 2025

Collection date:

July 2016 - August 2016

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Bibby HydroMap were commissioned in July 2016 by DONG Energy to carry out a survey after a rock
dumping campaign at West of Duddon Sands Windfarm (WDS01), and an Asset Integration
Management (AIM) survey at Burbo Bank Windfarm (BBW01). The surveys was carried out between 30th July 2016 and 31st August
2016.  A bathymetric AIM survey on all WTG posi...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
4
Reports
2