Summary
On the instructions of Norfolk Marine Ltd, multibeam bathymetric and sidescan sonar surveys were carried out at Robin Rigg Wind Farm. The survey was undertaken during the period 11 April 2014 to 3 May 2014, and covered the turbine rows and export cable corridor.