2004, Cns Renewables, Scroby Sands, Scroby Sands Export Cable Project

2004, Cns Renewables, Scroby Sands, Scroby Sands Export Cable Project

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

October 2026

Collection date:

May 2004 - July 2004

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

On behalf of Vestas, CNS provided the Cable Installation Barges CIB Pontra Maris and the Fetsy L, complete with support anchor handling vessels and tow tug for the installation of the export cables. From this installation spread, the cables were simultaneously laid and buried from the Mean High Water Line to the wind farm location, all cables were ...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
3
Reports
6

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Daily Progress Reports from the Fetsy and Pontra Maris ...

Depth of Burial of the Cables During Construction

Route Position Listings for Cable Routes

Select a Package from the list on the left to see more information about it