Summary
The schedule to Licence required that a monitoring programme be carried out to determine the impact of the wind farm on the seal populations. This was specified as two aerial photographic surveys from fixed wing aircraft per month at low water for the six summer months (April to September) pre, during and post construction. Baseline pre-constructio...