2010, EMU, Sheringham Shoal, Sabellaria Video Study

2010, EMU, Sheringham Shoal, Sabellaria Video Study

Summary

Emu Ltd were commissioned by Scira Offshore Energy Ltd to undertake a benthic and Sabellaria spinulosa study in 2009 within the proposed Sheringham Shoal Offshore Windfarm site, off Sheringham, North Norfolk. These results are presented within a separate report (Emu Ltd., 2010a). An additional survey was undertaken in 2010, with sites for investigation selected from the new sidescan sonar data acquired during the UXO survey performed in 2009/2010 as specified in the survey specifications within Appendix VIII (Emu Ltd., 2010a).
Categories
Benthic EcologySedimentology
Development
Sheringham Shoal
Industry
Wind
Phase
Pre-construction
Organisation
EMU
Available in this series
1 Report

Data & downloads

Reports

Data Highlights