2010, Gardline Environmental, Sheringham Shoal Offshore Windfarm, Seabed Intervention UXO Clearance Survey

2010, Gardline Environmental, Sheringham Shoal Offshore Windfarm, Seabed Intervention UXO Clearance Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

April 2010 - April 2010

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Gardline Environmental was contracted by SCIRA to provide Seabed Intervention Services including UXO clearance operations on the Sheringham Shoal Windfarm site and export corridors. Target locations were provided by SCIRA from data acquired by previous surveys. The investigations were concentrated on targets identified within 25m of proposed inter-...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1