2009, CMACS, Burbo Bank, Benthic Grab Survey Year 3

2009, CMACS, Burbo Bank, Benthic Grab Survey Year 3

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

July 2026

Collection date:

September 2009 - September 2009

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Burbo Offshore Wind Farm is a twenty-five turbine, 90MW development located in Liverpool Bay approximately 6km from the coastlines of Wirral, Crosby and Liverpool. The benthic (seabed) monitoring programme consists of surveys by grab sampling and beam trawling (the latter providing information on demersal fish as well as epibenthic invertebrates an...

Categories:
Benthic Ecology
Sedimentology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Report

Select a Package from the list on the left to see more information about it