2004, BACTEC International, Sheringham Shoal, UXO Threat Assessment

2004, BACTEC International, Sheringham Shoal, UXO Threat Assessment

Summary

The Site. A seventy five turbine windfarm is to be constructed off the North Norfolk coast, to the North of the Sheringham Shoal and just inside the 12 nautical mile (nm) limit. The cables will come ashore near to Weybourne. This Study. BACTEC has completed an Unexploded Ordnance Threat Assessment of the Project and the proposed Site. Proposed Works. The foundations for the turbines will be a mono-pile or a number of piles that will penetrate the seabed to an estimated maximum depth of 25m. Cables will be buried in the seabed to a depth of 3m. The UXO Threat. Evidence was found of past military activity in the area. These operations involved coastal defences and minefields along the coastline and in the North Sea to protect WWII Convoy Routes. The Germans laid sea mines in the area from aircraft, ships and submarines with devastating effect. Whilst many of these operations were outside the immediate area of the Site, the ensuing effects of the sea, weather and fishing may have transported and buried UXO in the area. The Anti Aircraft Gunnery School at Weybourne will have sown an offshore area with unexploded munitions. Unexploded Ordnance (UXO) Risk. The risk from WWII UXO is considered to be as follows: Mines - Medium, Aircraft Delivered Bombs - Low, Anti Aircraft Munitions - Low. In the circumstances Risk Mitigation Measures are advised. Risk Mitigation Measures.
Categories
Geophysical
Development
Sheringham Shoal
Industry
Wind
Phase
Pre-construction
Organisation
BACTEC International
Available in this series
1 Report

Data & downloads

Reports