2008, Metoc, Sheringham Shoal, Cable Landfall Erosion Study

2008, Metoc, Sheringham Shoal, Cable Landfall Erosion Study

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

June 2008 - June 2008

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

StatoilHydro is planning to install two export cables to connect its Sheringham Shoal
Offshore Wind Farm to the UK National Grid. The landfall will be at Weybourne on the North
Norfolk coast. This desk study was commissioned to identify the optimum burial depth of the
cables at the landfall by investigating the surface geology. Design requirements ...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'