2014, Fugro EMU, Sheringham Shoal, Bathymetric Survey

2014, Fugro EMU, Sheringham Shoal, Bathymetric Survey

Summary

Fugro EMU Limited (Fugro EMU) was commissioned by Scira Offshore Energy Limited to conduct a bathymetry survey of the Sheringham Shoal Offshore Wind Farm and export cables. The survey was required to fulfil Marine Management Organisation (MMO) requirements for post-construction monitoring. In order to meet these requirements, the scope of work required that Fugro EMU provide the following deliverables and reports:  Accurate bathymetry coverage of the inter-array and export cables  Reporting on any changes in conditions since the 2013 Marine Survey The survey was undertaken between 30th April and 4th May 2014 on board Fugro Seeker, all survey objectives and contractual requirements were achieved.
Categories
Geophysical
Development
Sheringham Shoal
Industry
Wind
Phase
Post-construction
Organisation
Fugro EMU
License
Marine Data Exchange Terms of Use

Data & downloads

Reports