Summary
The second post-construction survey of benthic resources was undertaken at the Sheringham Shoal Offshore Wind Farm (OWF) by Marine Ecological Surveys Limited (MESL) during sampling events in April and May 2014. The principle objectives of this second Sheringham Shoal post-construction benthic monitoring survey were to describe the seabed sediments ...