2012, Fugro EMU, Sheringham Shoal, Year 1 Monitoring Benthic Survey

2012, Fugro EMU, Sheringham Shoal, Year 1 Monitoring Benthic Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

December 2012 - December 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

In 2009, EMU Limited (now Fugro EMU Limited) was commissioned the pre-construction survey to inform the
application for developing Sheringham Shoal wind farm. The study included assessment of the benthic
invertebrate community of the area as well as the presence and extension of any Sabellaria spinulosa reef, an
Annex I habitat. The aim of the work...

Categories:
Benthic Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Data Highlights


Explore the wealth of the data gathered in the 2012, Fugro EMU, Sheringham Shoal, Year 1 Monitoring Benthic Survey


4

Sheringham Shoal Post Construction Monitoring Benthic Survey (2012)