2010, Entec, Teesside, Onshore Environmental Statement Addendum

2010, Entec, Teesside, Onshore Environmental Statement Addendum

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

March 2010 - December 2010

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This report forms an Addendum to the Environmental Statement for the Teesside Offshore Wind Farm (TOWF ES (2004)) and therefore constitutes the report of an Environmental Impact Assessment of the proposed onshore cable link and substation associated with the TOWF. The following environmental effects were considered within the ES Addendum: landscape...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1