2016, Bibby HydroMap, Teesside, Geophysical Survey

2016, Bibby HydroMap, Teesside, Geophysical Survey

Summary

Teesside Offshore Wind Farm (OWF) is a 62MW site comprised of 27 turbines, owned and operated by Teesside Windfarm Limited (TWL). Bibby HydroMap were contracted to provide surveys in order to monitor the seabed state; specifically the identification of seabed debris and scour or sediment accretion within the wind farm area. The survey was completed under LOGIC Terms and Conditions. The survey works were conducted by MV Lia and were undertaken between 23rd and 30th March 2016. The aims of the survey were: - To identify debris within the construction area; - To identify any changes to seabed morphology, to enable the evaluation of the effectiveness of installed scour protection and ratify the predictions for scour development and inform the foundation and cable maintenance schedule - To satisfy the requirements of the Marine Licence, specifically the monitoring of Archaeological Exclusion Zones.
Categories
Geophysical
Development
Teesside
Industry
Wind
Phase
Post-construction
Organisation
Bibby HydroMap
License
Marine Data Exchange Terms of Use

Data & downloads

Datasets