2012, Hayes McKenzie, Teesside, Assessment of Existing Background Noise Levels

2012, Hayes McKenzie, Teesside, Assessment of Existing Background Noise Levels

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

April 2026

Collection date:

January 2012 - January 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The Hayes McKenzie Partnership Ltd. has been contracted by EDF Energy Renewables to undertake background noise monitoring in the town of Redcar in Yorkshire. The purpose of the monitoring is to provide supporting evidence for an increase to the allowable noise emissions from construction noise associated with piling activities at the Teesside Wind ...

Categories:
Noise
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

2012, Hayes McKenzie Partnership Ltd, Teesside Offshore...

Select a Package from the list on the left to see more information about it