2010, Offshore Marine Management, Burbo Bank, Export and Inter Array Cables Inspection Survey

2010, Offshore Marine Management, Burbo Bank, Export and Inter Array Cables Inspection Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

June 2010 - June 2010

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

DONG Energy awarded Offshore Marine Management (OMM) a contract to perform an
inspection survey of the offshore export connecting the Burbo Offshore Wind Farm located
to the shore in Liverpool Bay. This included the BB13 to BB14 inter array power cable.
Burbo Offshore Windfarm is located approximately 8 Kilometres offshore and the shore
landing is ...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'