2014, Osiris Projects, Teesside, Operations and Maintenance Geophysical Survey (AugSept)

2014, Osiris Projects, Teesside, Operations and Maintenance Geophysical Survey (AugSept)

Summary

Operations and maintenance geophysical survey for Teesside Offshore Wind Farm between 19 August and 3 September 2014. The aims of the survey were to; to identify debris within the construction area; to identify changes to seabed morphology; to enable the evaluation of the effectiveness of installed scour protection and ratify the predictions for scour development; to Inform the foundation and cable maintenance schedule; and to satisfy the requirements of the Marine License, specifically the monitoring of Archaeological Exclusion Zones.
Categories
Geophysical
Development
Teesside
Industry
Wind
Phase
Post-construction
Organisation
Osiris Projects
Available in this series
5 Datasets, 3 Reports

Data & downloads

Datasets