Summary
Operations and maintenance geophysical survey for Teesside Offshore Wind Farm between 19 August and 3 September 2014. The aims of the survey were to; To identify debris within the construction area; To identify changes to seabed morphology; To enable the evaluation of the effectiveness of installed scour protection and ratify the predictions for sc...