
2014, Osiris Projects, Teesside, Operations and Maintenance Geophysical Survey (AugSept)
Summary
Operations and maintenance geophysical survey for Teesside Offshore Wind Farm between 19 August and 3 September 2014. The aims of the survey were to; to identify debris within the construction area; to identify changes to seabed morphology; to enable the evaluation of the effectiveness of installed scour protection and ratify the predictions for scour development; to Inform the foundation and cable maintenance schedule; and to satisfy the requirements of the Marine License, specifically the monitoring of Archaeological Exclusion Zones.
Data & downloads
Datasets
