2014, Osiris Projects, Teesside Offshore Wind Farm, Operations and Maintenance Geophysical Survey (AugSept)

2014, Osiris Projects, Teesside Offshore Wind Farm, Operations and Maintenance Geophysical Survey (AugSept)

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

November 2021

Collection date:

August 2014 - September 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

November 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Operations and maintenance geophysical survey for Teesside Offshore Wind Farm between 19 August and 3 September 2014.
The aims of the survey were to; To identify debris within the construction area; To identify changes to seabed morphology; To enable the evaluation of the effectiveness of installed scour protection and ratify the predictions for sc...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
5
Reports
3