2005, RHDHV, Thanet, Ecological Assessment of a Cable Route at Pegwell Bay

2005, RHDHV, Thanet, Ecological Assessment of a Cable Route at Pegwell Bay

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

April 2005 - June 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

September 2024

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This project examines the ecological assessment of a cable route undertaken at Pegwell Bay from within the site of the Thanet Offshore Wind Farm. This ecological assessment is required as part of the Ecological Impact Assessment (EIA) of the wind farm.

The survey area for Phase 1 habitat/land use survey and for most protected species comprised the...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1