Summary
Four elasmobranch surveys were undertaken within and adjacent to the Thanet offshore wind farm along the export cable route: two pre-construction in September 2007 and July 2008, and two post-construction surveys were undertaken in August and September 2012. The aim of the survey was to establish the abundance and composition of elasmobranch spec...