2013, Titan Environmental Surveys, Thanet, Scour Survey (Campaign 3)

2013, Titan Environmental Surveys, Thanet, Scour Survey (Campaign 3)

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

August 2022

Collection date:

April 2013 - April 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

August 2022

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Titan Environmental Surveys Ltd was commissioned by Gardline Geosurvey Ltd to conduct the third campaign for the Thanet Offshore Windfarm post-construction scour survey around 4No representative turbines and 4No cable crossing points to monitor the scour around these structures. The windfarm is located approximately 20km north east of Ramsgate with...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
4