2012, Osiris Projects, Triton Knoll, Export Cable Route Survey

2012, Osiris Projects, Triton Knoll, Export Cable Route Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

April 2026

Collection date:

September 2012 - November 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

February 2024

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Osiris Projects were commissioned in April 2012 by RWE npower renewables and Senergy Survey and GeoEngineering to carry out a geophysical and geotechnical cable route survey along the proposed Triton Knoll Export cable route. The proposed Triton Knoll Offshore Wind Farm is located in the Greater Wash Strategic Environmental Assessment (SEA) area, a...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
7
Reports
5