Summary
An underwater acoustic survey was carried out during the installation of the first four foundations V11, V12, U10, and T09 between 17th January 2020 and 26th February 2020. This survey was performed to record the noise levels emitted during installation. The levels were measured at different distances from the piles and results were compared to th...

