2009, DONG, Walney, Decommissioning Programme

2009, DONG, Walney, Decommissioning Programme

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

August 2009 - August 2009

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This Decommissioning Programme has been prepared by DONG Energy in August 2009 to comply with the license conditions for Walney Offshore Windfarm. The proposed decommissioning measures set out in this project aims to adhere to the existing UK and International legislation and guidance notes. In addition, decommissioning industry best practice will ...

Categories:
Engineering Design
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1