2014, Titan, Walney Offshore Wind Farm, Export Cable Route Infill Survey

2014, Titan, Walney Offshore Wind Farm, Export Cable Route Infill Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

June 2014 - June 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Project Number:
CS0439.  In June 2014, Titan Environmental Surveys were commissioned by Dong Energy to conduct a geophysical and bathymetric survey for an area of Export Cable Route not previously surveyed. The objectives of the survey were to collect Geophysical and Bathymetric data around the area where the cable had been laid outside of the orig...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
5
Reports
1