2014, Titan, Walney, Export Cable Route Infill Survey

2014, Titan, Walney, Export Cable Route Infill Survey

Summary

In June 2014, Titan Environmental Surveys were commissioned by Dong Energy to conduct a geophysical and bathymetric survey for an area of Export Cable Route not previously surveyed. The objectives of the survey were to collect Geophysical and Bathymetric data around the area where the cable had been laid outside of the original survey limits, checking for depth of burial or any cable exposure. The survey would be undertaken with Single Beam Bathymetry, Swathe Bathymetry, Side Scan Sonar (SSS), Sub Bottom Profiler and Magnetometer.
Categories
Geophysical
Development
Walney
Industry
Wind
Phase
Post-construction
Organisation
Titan
Available in this series
5 Datasets, 1 Report

Data & downloads

Datasets