2012, EGS, Walney Offshore Wind Farms, May Post-Construction Survey

2012, EGS, Walney Offshore Wind Farms, May Post-Construction Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

May 2012 - May 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

In May 2012 EGS (International) Ltd was contracted to undertake a bathymetric survey in
the post-construction (operational) phase of the project to determine whether there are
any changes to seabed morphology at the wind farm site including inter array cables and
along the export cable routes. In addition the survey covered three locations where de...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'