2012-2013, Fugro Alluvial, Walney Extension, Geotechnical Site Investigation (Cable Route)

2012-2013, Fugro Alluvial, Walney Extension, Geotechnical Site Investigation (Cable Route)

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

October 2012 - January 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

A ground investigation has been carried out by Fugro Alluvial Offshore Limited (FAOL) on the
instructions of DONG Energy Power (UK) Limited (DONG) for the development of the Walney
Extension offshore windfarm site in the Irish Sea. The site is located between approximately 21 km to
45 km west of the Isle of Walney and the west coast of Cumbria in t...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
2