2011, DONG Energy, Walney Extension, Stage One Consultation

2011, DONG Energy, Walney Extension, Stage One Consultation

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

June 2011 - August 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This Stage One Consultation seeks to inform the reader about the proposed Walney Extension offshore wind farm project  by identifying the currently anticipated key issues associated with the construction, operation and decommissioning phases of the Project and providing consultees and local communities with further information to understand the nat...

Categories:
Benthic Ecology
Birds
Epifauna and Fish
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1