
2012, Fugro Alluvial, Walney Extension, Geotechnical Site Investigation (Cable Route)
Summary
Fugro Alluvial Offshore Limited (FAOL) was requested by Dong Energy Power (UK) Limited to perform a geotechnical investigation at the site to provide soils information to assist in the design and installation of a cable route. The work was performed from the Fugro Commander from 25 October to 16 November 2012 in accordance with instructions received from Dong Energy Power (UK) Limited.
Data & downloads
Datasets
