Summary
In May 2012 EGS (International) Ltd was contracted to undertake a pre-construction geophysical and bathymetric survey of the export cable route of the future Walney Extension (WOW03) windfarm site. The surveyed areas were located 22-30 km north-northwest of Walney Island, UK. Survey operations were carried out in three distinct locat...