2012, EGS, Walney Extension, Export Cable Route Additional Geophysical Survey

2012, EGS, Walney Extension, Export Cable Route Additional Geophysical Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2026

Collection date:

May 2012 - May 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

In May 2012 EGS (International) Ltd was contracted to undertake a pre-construction geophysical and bathymetric survey of the export cable route of the future Walney Extension (WOW03) windfarm site. The surveyed areas were located 22-30 km north-northwest of Walney Island, UK. Survey operations were carried out in three distinct locations; Block 1 a...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
2
Reports
2

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Processed Data

Raw Data

Select a Package from the list on the left to see more information about it