2011, EMU, Wave Hub (Hayle), Noise Survey

2011, EMU, Wave Hub (Hayle), Noise Survey

Summary

This report has been prepared by Subacoustech Environmental Ltd for EMU Limited. It describes the baseline conditions found at the site for the installation of a wave energy facility, approximately 15 km off the north coast of Cornwall. A number of background underwater noise measurements were taken at five locations for a minimum duration of 15 minutes and repeated after a delay of over 1 hour.
Categories
Noise
Development
Wave Hub (Hayle)
Industry
Wave
Phase
Pre-construction
Organisation
EMU
Available in this series
3 Datasets, 1 Report

Data & downloads

Datasets