2011, EMU, Wave Hub (Hayle), Test Centre Cable Route Baseline Hydrographic Survey

2011, EMU, Wave Hub (Hayle), Test Centre Cable Route Baseline Hydrographic Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2026

Collection date:

September 2011 - September 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

December 2024

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

EMU Limited was commissioned by Halcrow Group Limited to conduct a baseline hydrographic survey. The survey was undertaken between the 27th September and the 29th September 2011 onboard Nab Cat II, an 11 m survey vessel operating out of St Ives. The purpose of the survey was to provide a baseline for future post‐construction monitoring surveys cove...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
4
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

ASC Files

Drawing Files

GSF Files

Project Records

Select a Package from the list on the left to see more information about it