2016, Insight Marine Projects, Wave Hub (Hayle), Cable Tail Installation As-Built Survey

2016, Insight Marine Projects, Wave Hub (Hayle), Cable Tail Installation As-Built Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

July 2024

Collection date:

July 2016 - August 2016

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

December 2024

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Insight Marine Projects Ltd were contracted to supply construction support services to James Fisher Marine Services Ltd during the cable tail extensions project at the WaveHub wave energy test site, Cornwall, UK. Installation of the cable extensions was undertaken onboard OSCV ‘Aker Wayfarer’.
An ‘As-Built’ visual (ROV) and multibeam (MBES) survey ...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
4
Reports
4