2014, Boskalis Offshore, West of Duddon Sands, Provision of Rock Installation Services
Summary
DONG Energy West of Duddon Sands (UK) Ltd., and ScottishPower Renewables (WoDS) Ltd. awarded the Rock Installation contract for West of Duddon Sands – cable crossings Project to Boskalis Offshore. The report in this series, Project Installation Procedures (PIP), has been prepared to provide information regarding the following aspects of the project:
• Scope of work;
• Working methods;
• Materials to be used;
• Quality control procedures;
• Planning;
• Deliverables
At four crossing locations the exposed cable will be covered with rock. A filter layer has been installed prior to the final armour layer. A separation layer has been installed prior to the cable lay.