2013, DONG Energy and Scottish Power Renewables, West of Duddon Sands, Environmental Monitoring Report

2013, DONG Energy and Scottish Power Renewables, West of Duddon Sands, Environmental Monitoring Report

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2023

Collection date:

January 2013 - December 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2023

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This report presents the results from the pre-construction monitoring
programme for West of Duddon Sands Offshore Windfarm and has been
prepared to comply with Conditions associated with the Marine License for
West of Duddon Sands Offshore Windfarm (L/2012/00424).
The report seeks to provide a clear and concise account of methodologies and
results ...

Categories:
Birds
Epifauna and Fish
Geophysical
Marine Mammals
Sedimentology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1